‘Sno-Co squeeze’ commuters find ways to cope; relief in sight

MARYSVILLE — Friday was bad.

Monday was a doozy.

Tuesday was no breeze.

These are the dog days of the so-called “Snohomish County squeeze” as construction workers replace I-5 expansion joints between Everett and Marysville.

The maintenance project slowed traffic in previous weeks, but Friday afternoon devolved into a 12-mile backup and Monday and Tuesday reduced traffic to a 10-mile trickle.

Gridlock has spilled into alleys and side streets in north Everett for those zigzagging their way to I-5 or taking Highway 529 across the flats.

“Getting home is pretty miserable,” said Heidi Thoreson, a contract employee for pathology services at Providence Regional Medical Center Everett. “It’s taking at least twice as long to get home.”

On Tuesday, her commute to her home on the north end of the Tulalip Indian Reservation took one hour and six minutes.

“I listen to music and tell myself ‘I’m not going to get there any faster if I get upset,’ ” she said.

A couple of key factors are contributing to the snail’s pace.

The far right lane of I-5 leading off of Highway 529 northbound merges into traffic, and a sign tells drivers to yield to vehicles on I-5.

You also can blame Seattle — at least a bit.

Snohomish County is feeling a ripple from the closure of the Alaskan Way Viaduct in Seattle.

“The viaduct isn’t causing this, but it is shifting our traffic patterns,” said Lisa Van Cise, a state Department of Transportation spokeswoman.

Commuters are changing habits, including the times they leave work, hoping to beat the traffic crunch.

“We start to get a backup much earlier than before,” Van Cise said. “You have almost a trickle-down effect.”

Backups lasted until 9 p.m. Friday. By Tuesday, lanes were cleared by 7:45 p.m.

Some level of relief is in sight if the weather cooperates.

By the end of next week, after more re-striping, the merging mess from Highway 529 to I-5 should be improved.

The work on the northbound lanes is expected to be finished by June 16.

Road crews have been replacing 41 expansion joints over I-5 bridges between Everett and Marysville as part of a two-year, $5.3 million project. Weekend lane closures for southbound work already have taken place.

On weekdays, three narrower lanes are available with a 45 mph speed limit.

Most weekends are reserved for replacing the expansion joints, with jackhammers and other preparation work occurring behind concrete barriers during the week. On those weekends, only two narrower lanes are available. No closures are planned during Memorial Day weekend.

Expansion joints allow concrete sections of bridges to expand and contract as temperatures go up and down and traffic loads vary. As the joints deteriorate, they become safety hazards to drivers. They can bend, crack or collapse. The expansion joints being replaced range from 20 to 30 years old.

Tim Vaughan doesn’t get too worked up over the I-5 gridlock.

The Mount Vernon man, who spent much of his childhood in Lynnwood, commutes to his job south of Seattle during the week. He previously worked in downtown Seattle, a big reason for the 494,000 miles he put on a 1996 Toyota pickup truck.

He’s accustomed to slowdowns in north King County through Lynnwood and Everett.

“You just exercise patience,” he said. “You find some entertainment on the radio, stay off the cellphone and you’ll get through it.”

During the recent construction on the Steamboat Slough and Ebey Slough bridges, he has noticed the frustration among drivers not using turn signals and desperately looking for ways to weave through the congestion. Thoreson on Tuesday saw similar impatience on the streets leading onto Broadway in Everett.

Vaughan well remembers 2001. For longtime commuters, that was the summer of the snarl. Northbound Highway 529 was closed several weeks for construction.

“It was brutal,” he said.

On his way home Monday, he stopped in Everett to carpool with a friend. They left around 5:40 p.m. and pulled into Mount Vernon around 7:10 p.m. Tuesday he left a little earlier and the commute was a bit better, taking roughly 70 minutes from Everett.

The late arrival didn’t change dinner plans. He had pork chops and vegetables Monday and spaghetti Tuesday.

He said he accepts the slow commute for what it is: a necessary inconvenience for an important maintenance project that must be done.

Dealing with bottlenecks just makes him appreciate his destination all that much more.

“Getting home has been a delight, quite frankly, because you are home,” he said.

Eric Stevick: 425-339-3446; stevick@heraldnet.com.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

In this Jan. 4, 2019 photo, workers and other officials gather outside the Sky Valley Education Center school in Monroe, Wash., before going inside to collect samples for testing. The samples were tested for PCBs, or polychlorinated biphenyls, as well as dioxins and furans. A lawsuit filed on behalf of several families and teachers claims that officials failed to adequately respond to PCBs, or polychlorinated biphenyls, in the school. (AP Photo/Ted S. Warren)
Judge halves $784M for women exposed to Monsanto chemicals at Monroe school

Monsanto lawyers argued “arbitrary and excessive” damages in the Sky Valley Education Center case “cannot withstand constitutional scrutiny.”

Mukilteo Police Chief Andy Illyn and the graphic he created. He is currently attending the 10-week FBI National Academy in Quantico, Virginia. (Photo provided by Andy Illyn)
Help wanted: Unicorns for ‘pure magic’ career with Mukilteo police

“There’s a whole population who would be amazing police officers” but never considered it, the police chief said.

Alan Edward Dean, convicted of the 1993 murder of Melissa Lee, professes his innocence in the courtroom during his sentencing Wednesday, April 24, 2024, at Snohomish County Superior Court in Everett, Washington. (Ryan Berry / The Herald)
Bothell man gets 26 years in cold case murder of Melissa Lee, 15

“I’m innocent, not guilty. … They planted that DNA. I’ve been framed,” said Alan Edward Dean, as he was sentenced for the 1993 murder.

People hang up hearts with messages about saving the Clark Park gazebo during a “heart bomb” event hosted by Historic Everett on Saturday, Feb. 17, 2024 in Everett, Washington. (Olivia Vanni / The Herald)
Clark Park gazebo removal complicated by Everett historical group

Over a City Hall push, the city’s historical commission wants to find ways to keep the gazebo in place, alongside a proposed dog park.

Hawthorne Elementary students Kayden Smith, left, John Handall and Jace Debolt use their golden shovels to help plant a tree at Wiggums Hollow Park  in celebration of Washington’s Arbor Day on Wednesday, April 13, 2022 in Everett. (Olivia Vanni / The Herald)
Snohomish County to hold post-Earth Day recycling event in Monroe

Locals can bring hard-to-recycle items to Evergreen State Fair Park. Accepted items include Styrofoam, electronics and tires.

Everett
Everett baby dies amid string of child fentanyl overdoses

Firefighters have responded to three incidents of children under 2 who were exposed to fentanyl this week. Police were investigating.

Everett
Everett police arrest different man in fatal pellet gun shooting

After new evidence came to light, manslaughter charges were dropped against Alexander Moseid. Police arrested Aaron Trevino.

A Mukilteo Speedway sign hangs at an intersection along the road on Sunday, April 21, 2024, in Mukilteo, Washington. (Ryan Berry / The Herald)
What’s in a ‘speedway’? Mukilteo considers renaming main drag

“Why would anybody name their major road a speedway?” wondered Mayor Joe Marine. The city is considering a rebrand for its arterial route.

Edmonds City Council members answer questions during an Edmonds City Council Town Hall on Thursday, April 18, 2024 in Edmonds, Washington. (Olivia Vanni / The Herald)
Edmonds fire service faces expiration date, quandary about what’s next

South County Fire will end a contract with the city in late 2025, citing insufficient funds. Edmonds sees four options for its next step.

House Transportation Subcommittee Chairman Rep. Rick Larsen, D-Wash., speaks during a hearing on Capitol Hill in Washington, Wednesday, May 15, 2019, on the status of the Boeing 737 MAX aircraft.(AP Photo/Susan Walsh)
How Snohomish County lawmakers voted on TikTok ban, aid to Israel, Ukraine

The package includes a bill to ban TikTok if it stays in the hands of a Chinese company, which made one Everett lawmaker object.

FILE - In this May 26, 2020, file photo, a grizzly bear roams an exhibit at the Woodland Park Zoo, closed for nearly three months because of the coronavirus outbreak in Seattle. Grizzly bears once roamed the rugged landscape of the North Cascades in Washington state but few have been sighted in recent decades. The federal government is scrapping plans to reintroduce grizzly bears to the North Cascades ecosystem. (AP Photo/Elaine Thompson, File)
Grizzlies to return to North Cascades, feds confirm in controversial plan

Under a final plan announced Thursday, officials will release three to seven bears per year. They anticipate 200 in a century.s

ZeroAvia founder and CEO Val Mifthakof, left, shows Gov. Jay Inslee a hydrogen-powered motor during an event at ZeroAvia’s new Everett facility on Wednesday, April 24, 2024, near Paine Field in Everett, Washington. (Ryan Berry / The Herald)
ZeroAvia’s new Everett center ‘a huge step in decarbonizing’ aviation

The British-American company, which is developing hydrogen-electric powered aircraft, expects one day to employ hundreds at the site.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.